Design required a topographic survey of the existing roadway, bridge structures and stream bed; preparation of Erosion & Sedimentation Plan; all permitting; hydraulic analysis utilizing HEC-RAS; roadway alignment and culvert design in accordance with PennDOT standards.
Hydraulic analysis indicated that additional right-of-way was required. Quad3 was responsible for determining ownership of existing properties, required right-of-way, and the preparation of right-of-way acquisition plans