Box Culvert Replacement, Beaver Run

Sorber Mountain Road, Lake Township, PA
Project Navigation
The scope of work required the design and replacement of an existing collapsed concrete bridge over Beaver Run with a precast concrete box culvert and precast concrete wing walls and pavement improvement on each bridge approach (25’ +/-). read more

Box Culvert Replacement, Beaver Run

Design required a topographic survey of the existing roadway, bridge structures and stream bed; preparation of Erosion & Sedimentation Plan; all permitting; hydraulic analysis utilizing HEC-RAS; roadway alignment and culvert design in accordance with PennDOT standards.

Hydraulic analysis indicated that additional right-of-way was required.  Quad3 was responsible for determining ownership of existing properties, required right-of-way, and the preparation of right-of-way acquisition plans