The purpose of the project was to eliminate an aging water tank, store fire protection water, and install a direct connection to the water company main. Quad3 engineers analyzed the situation and designed a new water vault to distribute the domestic water and fire protection water appropriately. The piping leaving the new water vault had to travel under an active rail spur before it entered the BIDA building. The final phase of the project was to assist BIDA with the procurement of a new fire pump to match the water characteristics of the new system.