Renovations included replacing the existing cinder track with a new 6-lane oval with an 8-lane straight synthetic (EDPM/urethane) equal quadrant running track and removal of the existing natural grass (native soil) athletic field and replacing with a sand grid type natural grass athletic field complete with perforated PVC underdrainage system.
Other improvements included construction of a new ticket booth entry area, including turnstiles, replacement of the stadium perimeter chain link fencing, restoration of the existing paved access drive, construction of a new access drive, provision of ADA accessible parking near the grandstands, extension of water service to the field for irrigation, new track and field venues (high jump, pole vault, long/triple jump, shot, and discus), installation of a perimeter service drive/walkway around the new track, replacement of the home and visitor grandstands, and storm drainage improvements.