138,000 – 4,160 Volt Substation - Borough of Zelienople

Zelienople, PA

Quad3 was retained by the Borough of Zelienople to design a new 138,000 – 4,160 volt, 28MVA facility and interconnecting 4.16KV distribution feeders to replace the existing 4.16KV switch-station. Quad3’s responsibilities included: determination of substation siting including land procurement, coordination with First Energy, substation design, 4.16KV system design, field construction services and as-built drawings.

PROJECT STATS

Size:

138,000 - 4,160 Volts

Services:

Power Systems Engineering; Structural Engineering; Civil Engineering; Structural Engineering